✨ New Arrivals Just Dropped!Explore
225mm Starter Tie with 8mm plug
HomeStore

225mm Starter Tie with 8mm plug

225mm Starter Tie with 8mm plug

Starter ties are used where new walls are being built directly from existing brickwork, these starter ties are quick and easy to install.

Benefits

  • Suitable for use in brickwork and blockwork up to 3 storeys high or 8m in height
  • Meets the technical requirements of the NHBC
  • Supplied with 8mm nylon wall plug

 

Good to know

  • The starter tie is fixed into the existing wall at an angle of 30° to the horizontal and bent into the bed joints of the new brickwork.
  • Ties should be fixed at 225mm vertical centres and be central to each leaf of the new wall.
$66.77

Original: $190.76

-65%
225mm Starter Tie with 8mm plug

$190.76

$66.77

More Images

225mm Starter Tie with 8mm plug - Image 2

225mm Starter Tie with 8mm plug

Starter ties are used where new walls are being built directly from existing brickwork, these starter ties are quick and easy to install.

Benefits

  • Suitable for use in brickwork and blockwork up to 3 storeys high or 8m in height
  • Meets the technical requirements of the NHBC
  • Supplied with 8mm nylon wall plug

 

Good to know

  • The starter tie is fixed into the existing wall at an angle of 30° to the horizontal and bent into the bed joints of the new brickwork.
  • Ties should be fixed at 225mm vertical centres and be central to each leaf of the new wall.

Product Information

Shipping & Returns

Description

Starter ties are used where new walls are being built directly from existing brickwork, these starter ties are quick and easy to install.

Benefits

  • Suitable for use in brickwork and blockwork up to 3 storeys high or 8m in height
  • Meets the technical requirements of the NHBC
  • Supplied with 8mm nylon wall plug

 

Good to know

  • The starter tie is fixed into the existing wall at an angle of 30° to the horizontal and bent into the bed joints of the new brickwork.
  • Ties should be fixed at 225mm vertical centres and be central to each leaf of the new wall.